sexta-feira, 29 de março de 2013

Big update today with all the photos from these last few days which I didnt had the time to update the blog.

Finally the pladur guy showed up again and finished the ceiling of the live and control room. It still needs to fill in the joints.


The roof is finished and joints painted with a rubber ink to be sure no water comes in.




Toillet back wall is ready and looking good


In addition the water deposit for the toillet arrived and was installed yesterday


Plumbing for all the toillet and AC drain is complete.



Electrical Box wall is filled with concrete and finished.



Playing a bit with the panorama feature of my smartphone in the live room






1 comentário:

  1. I am hoping the same best effort from you in the future as well. In fact your creative writing skills has inspired me. architecture firms

    ResponderEliminar