Diary of the construction of a Recording Studio in Lisbon, Portugal
quarta-feira, 13 de março de 2013
Continuing the work on the ceiling. The live room has all the rails that will support the Drywall.
It will be filled with rockwool between the Drywall and the metal
Today they are starting the supports for the control room ceiling
Construction has also been going on in the the Toillet walls
Sem comentários:
Enviar um comentário