quarta-feira, 13 de março de 2013

Continuing the work on the ceiling. The live room has all the rails that will support the Drywall.
It will be filled with rockwool between the Drywall and the metal


Today they are starting the supports for the control room ceiling


Construction has also been going on in the the Toillet walls



Sem comentários:

Enviar um comentário