sexta-feira, 15 de março de 2013

Lots of people at the studio today.
The constructor, the Designer, Head Electrician, Head Carpinter, Helpers, Workers the whole bunch.
Lots of things to decide and to get done.
Meanwhile the Ceiling on the corridors gets the structure done.

The light fixture will be a continuous light beam going all the way through the corridor around the corner into the rest area.

The ceiling structure for small the resting area is also nearly done.


Electricity is also connected, or at least thats what EDP says. We will give it a test the next couple of days when the wiring is done.

The space in the wall for the electrical box is opened and tubing is passed for the control room.



Sem comentários:

Enviar um comentário