sexta-feira, 31 de maio de 2013
quinta-feira, 30 de maio de 2013
quarta-feira, 22 de maio de 2013
Not of a lot of updates lately. Been busy applying primer and paint to the ceilings and toilet.
Also applied a sealing agent to the floor of the hallway and corridor and then a auto-leveling epoxy kind of paint.
A pano of the ceiling after primer and first coat.
Here are some pics of the sealent.
Also applied a sealing agent to the floor of the hallway and corridor and then a auto-leveling epoxy kind of paint.
A pano of the ceiling after primer and first coat.
Here are some pics of the sealent.
The ventilation shaft is finished and ready for primer and paint. Next weekend we'll finish it up!
Here is a pic of a toillet picture. The red is actually much darker and not orangy like it shows in this pic
And last a couple of pics of the epoxy after being applied waiting for drying up.
sexta-feira, 10 de maio de 2013
Big update today with a load of pictures.
Assembling the window frame in various steps.
Assembling the window frame in various steps.
Doors and Door frames arrived and assembled.
The lighting fixture for the corridor and hallway is finaly lit. It looks cool! Still needs a few tweaks to fill a few gaps.
The Rock wall is done. What do you guys think about it?
quarta-feira, 8 de maio de 2013
terça-feira, 7 de maio de 2013
segunda-feira, 6 de maio de 2013
Construction has resumed after a few days of relatively few activities besides passing power cables.
Stone for the booth outer wall has arrived and workers are now placing it.
Stone for the booth outer wall has arrived and workers are now placing it.
We opted for a traditional portuguese stone that is used in the streets. It allows for a big diffusion and hopefully look nice too :)
Started building the cover for the live room/booth ventilation with metal framing and pladur.
Subscrever:
Mensagens (Atom)
.jpeg)