Also the paneling for the vocal both and wood for the finishing touches have arrived
quarta-feira, 26 de junho de 2013
terça-feira, 18 de junho de 2013
Started paneling the live room.
Rock wool. Camira Fabrics. Wood frames. No secrets here.
Rock wool. Camira Fabrics. Wood frames. No secrets here.
On the far end to the left of the vocal booth is a huge closet for storage space for mics, guitars, etc. It was designed to give a bit of continuity to the wall panels.
After the basic paneling is done diffusers will go next.
4 ceiling diffusers, 3 on the left wall and the right wall will be almost all made of wood.
terça-feira, 11 de junho de 2013
Long time I had no updates, so here's a big one.
Here's a little hint on what was done
After a thorough cleaning of the floor to remove all the debris and dust started laying down the base mat.
It protects the floor from moist while reducing foot fall noise too.
After all the room was covered with the mat, started laying down one line of floor.
Its important that the mat is layed 90 degrees to the floating floor.
Checking the measurements so that we dont end with a planck smaller then 40cm, not recomended for stability
Here's a little hint on what was done
Thats right! Floor has arrived and I had a little help to install it on the live room.
Here are the progress photos.
After a thorough cleaning of the floor to remove all the debris and dust started laying down the base mat.
It protects the floor from moist while reducing foot fall noise too.
After all the room was covered with the mat, started laying down one line of floor.
Its important that the mat is layed 90 degrees to the floating floor.
Checking the measurements so that we dont end with a planck smaller then 40cm, not recomended for stability
After we built the first three rows in the middle of the room we moved them in position next to the left wall.
Then steadily continued adding more rows!
Thank god for power tools! Otherwise we would have taken ages to cut all the planks.
Family help! Almost done.
Took some better photos with my DSLR after it was complete.
Well almost complete, the door is a little out of place so I can't place the last two lines before the carpenter comes and fix it.
I think its looking awesome.
Started laying the mat for the vocal booth
Here's a pic of the toillet that its now finished.