Last night me and the AC guy stayed till late night passing the tubes and drains.
Ooops first hole was too low...
This is the end of our work on the control room for the day, after this the constructor workers will be opening a place in the wall for the wires to go within.
This is an example of a drain for one of the ACs with the rubber tubing all around it when it crosses a wall to avoid sound leaking in or out.
The Live room is also done, but this one already has the holes in the wall for the tubes to go through.
Plumbing in the toillet is done including the water drain for the shower. It is now covered in concrete.
We had to place a very long tube for the drain of the Live room unit to reach the toillet where the water is drained
Power tubes for the lighting of the live room and control room is also done. Need to pass the electrical cable through them after.
Tubing for the light switches is passed for the control room and live room.
Live room with a partial drywall ceiling cover.