Drywall ceilings in the hallway are done.
Still no sign of the Electrician... More delays... humpf
The constructor has finished 3 of the 4 walls of the toilet and was now doing the floor.
The constructor has finished 3 of the 4 walls of the toilet and was now doing the floor.
Lets hope the Electrician decides to show up this week...