quinta-feira, 25 de julho de 2013

New bunch of photos.

Got all the corners in the control room done.


I could stare at these diffusers forever. They look awesome 





The good news? We have lights in the ceiling panels 


In the other room the back wall diffuser and panels were installed.




quarta-feira, 24 de julho de 2013

Another big update, lots of control room photos.
The left and right diffusers are in place as well as the red panels.




And here's a perspective from near the end of the room


Its funny listening to the diffusion now. It rings like hell one the ceiling and back wall. It really confuses your brain e



Here's another update. Lots of photos of the control room panels.

This is the diffuser for the back wall


The front wall will be mostly reflective and just a bit of absorption to fix some 200hz issue we found in the preliminary measurements.


Here's a detail of the front wall


The diffusers for the left and right walls have also arrived. A whole stack of them 


Ahhh nothing like powertools 


The structure on the right wall and some of the paneling is already in place


And the red colored panels are awaiting its turn to be placed on the walls, they actually look a little orangy in the photos but they are really Red! 


Hopefully tomorrow will have more to show.






Ceiling panels are up. They are still going to have a backlit and maybe some downlights too.
We're still figuring if we're filling them with rockwool or leave them empty.



The wooden frame for the booth door is also complete.






Today the booth is 90% done. Only the ceiling panel is missing


Also continued with the finishing touches on the live room walls.



On the right wall we have a problem. Ran out of blue fabric, they tried what they thought was simillar but it really is noticeable. 
Gotta order some more fabric, damn :(







Major advances in the booth yesterday. It now has all the diffusers in place


The 4 diffusers are also in place on the right wall of the live room


Started with the finishing wood planks on the left wall



terça-feira, 9 de julho de 2013

Finally the carpenters are back and work is resumed.
Laying the panels for the vocal booth

 

The second day added more panels and the bass traps. 


They also started the right wall of the live room. One of the huge diffusers is up, 3 more to go.


The membrane covers for the vocal booth bass traps are ready to put in place.

quarta-feira, 26 de junho de 2013

The diffusors for the right wall have arrived, they are monsters.


Also the paneling for the vocal both and wood for the finishing touches have arrived




Here's today's update.

The left wall diffusers are in place. These things are huge!!!




And here's a detail of whats going on behind one of the panels


terça-feira, 18 de junho de 2013

Started paneling the live room.
Rock wool. Camira Fabrics. Wood frames. No secrets here.





On the far end to the left of the vocal booth is a huge closet for storage space for mics, guitars, etc. It was designed to give a bit of continuity to the wall panels.

After the basic paneling is done diffusers will go next.
4 ceiling diffusers, 3 on the left wall and the right wall will be almost all made of wood.