The structure for the ceiling in the corridors, control room and live room is done.
The light fixture structure for the ceiling in the corridors is also complete.
Here you can also see the detail of the tubes that will take the energy to the control room.
Toillet tubing and water deposit for the toillet that will be embeded in the wall is also complete, next step is finishing up the walls.
Here is how the control room is looking like right now.
Here is a detail of the ditch that will be used to bring all the cabling to the place where the desk will be.
This is how the Live room is looking like.
They are finishing the door frame for the vocal booth. It is now the exact measures for the frame we are planning to put for this glass door.