segunda-feira, 25 de fevereiro de 2013

Sunny day today, lets hope the weather sticks like this for the following days as we need to finish up the ceiling.
The metal that supports the ceiling for the control room is now in place waiting for the good weather.


The toillet walls are all the way to the top too with the door frame done.



The housing for the air conditioning is also in place.


The entrance door is now flush with the wall. It sure looks much nicer.

Sem comentários:

Enviar um comentário