Here is this weekend update. I managed to bring the DSLR and took some decente photos, rather then the crappy cell phone ones.
The walls are 90% done. Only a few from the control room still need to be done.
Here's the door of the control room.

This is the back wall at the far end where the toillet will be built.


The framing for the control room window is in place. It will be filled with concrete monday and the rest of the wall will be finished.


Here's a detail of the top frame of the control room window


This is the view of the recording space from the control room window


The control room from the window area. Almost there with the walls.



They spent the rest of the saturday filling up the concrete structures that will support the ceiling.


Powered by S.L.BENFICA right from the start :) Take notice of the cap from one of the builders.
This is a birdseye view from the top of a ladder behind the control room window


Detail of the supporting structure for the door build up.


The corridor from the entrance of the studio. Control room door to the left and main recording space straight ahead.