A  small update today.
I stopped by during the lunch break to see how things were going.
Main recording space walls and concrete pillars are 100%. Next building the concrete ceiling.


The window frame for the control room is also finished from the recording space side.


Here's a detail from the window construction.


Control room walls and pillars are 95% done. Probably the rest will be finished today.


One of the construction workers was doing a nap during the lunch break. Heavy sleep haha!