Diary of the construction of a Recording Studio in Lisbon, Portugal
sexta-feira, 22 de fevereiro de 2013
It has been raining cats and dogs these past days. Construction had to slow down due to the necessary outside work in the concrete ceilings.
Meanwhile they started building the toillet walls.