sábado, 2 de fevereiro de 2013

Big update with lots of photos this time taken with a decent camera

Managed to take some pictures but this time now with a decent camera instead of the lousy smartphone pictures.
Its definetly starting to look like something now that the walls are all built to a decent height.

Here's a view from the main recording space into the control room.
There's a huge pile of rock wool in the middle :)


This is the view from the door of the main recording space towards the entrance of the studio.


And here is the Control room looking at the windows towards the recording space as it stands now.


The control room towards the back side.


Detail of the space between the control room and main recording space.
It has two different density rock wool sheets.


This is the entrance of the studio, on the far side of this photo will be a small toillet.
The rest of the space still indecided on what to do, maybe some chairs, TV on the wall and a coffee table.

Overall view of the control room from the top of the wall as it stands today.


Corridor with the control room door to the left and main recording space at the far end.


And finally the outside of the studio now with the door and outer wall complete.




Sem comentários:

Enviar um comentário