Started building the vocal booth ceiling. It will be made of various layers of viroc and rock wool.
The toillet area has also had a big boost. The cabinet that disguises the toillet entrance and refrigerator, coffee machine, food cabinet is nearly complete.
Drywall ceiling has also all the joints filled and is almost ready for paint.
The electrician opened the holes for the lighting and pulled down the cables already passed through the pre-installed tubing.
Sem comentários:
Enviar um comentário