Here's a little hint on what was done
Thats right! Floor has arrived and I had a little help to install it on the live room.
Here are the progress photos.
After a thorough cleaning of the floor to remove all the debris and dust started laying down the base mat.
It protects the floor from moist while reducing foot fall noise too.
After all the room was covered with the mat, started laying down one line of floor.
Its important that the mat is layed 90 degrees to the floating floor.
Checking the measurements so that we dont end with a planck smaller then 40cm, not recomended for stability
After we built the first three rows in the middle of the room we moved them in position next to the left wall.
Then steadily continued adding more rows!
Thank god for power tools! Otherwise we would have taken ages to cut all the planks.
Family help! Almost done.
Took some better photos with my DSLR after it was complete.
Well almost complete, the door is a little out of place so I can't place the last two lines before the carpenter comes and fix it.
I think its looking awesome.
Started laying the mat for the vocal booth
Here's a pic of the toillet that its now finished.

















It is imperative that we read blog post very carefully. I am already done it and find that this post is really amazing. Urban design
ResponderEliminar